Italian-Thai Development Public Company Limited (SET: ITD) announced that on December 16, 2021, the company signed an EPC CONTRACT relating to Stage 1 Infrastructure Works with GULF MTP LNG TERMINAL COMPANY LIMITED to proceed with the Map Ta Phut Industrial Port Development, Phase 3 (Stage 1) Project. The contract value is THB 10,519,908,509 (Including VAT)
Description of works consist of revetment 5,400 m., breakwater 980 m., prefabricated caisson breakwater 650 m., dredging 2,030,000 m2 to elevation-16 m. PD, land reclamation 1,000 rai to elevation +4.80m. PD., facilities (access road, water supply, storm drainage system, water treatment, electric & fire fighting), service tugboat, navigation aid and diversion of pipelines at site entrance OR road bridge over pipelines. Period of works is 33.5 months.